On day 5 we studied about different view points (perspectives) each and everyone of us have about certain things. For the warm up we looked up at different scenes and guessed the scenario i.e. how each and every one of us perceive it as. for example one was a scene where two kids were selling cloths to people sitting the cars on a drive way.
The new word we discussed were stakeholders
so stakeholders are the people involved in the situation, basically the people with a role who are actually interlinked directly or indirectly.
PROJECT WORK
we were again divided into new groups and each of the groups were given a picture and we as a team had to point out different stakeholders involved in the picture and we had to make it into a chart.
The second part of the assignment was that we had to take any stakeholder and find a problem for it and then come to two solutions for it. i chose the stakeholder interior designer
and came up with the two solutions.
REFLECTION
This assignment really taught us that every aspect of designing even the smallest of the aspects like people involved in every way. Every time in think lab I am taught to notice more and consider everything and anything possible.
MANTRA
"consider everything"
Comments